What a week, down here, in the Holler. Big project! Moving out the small studio to build a bathroom. |
The east side of the studio moved into the west side of the studio. Steve hung a plastic wall to keep out the cement dust. |
The pressure tank installed. Waiting for two sinks, a toilet and hot water heater on Monday. |
My new Muck boots showed up just in the nick of time. I have been helping Steve move acres of mud. |
My desk is in the backseat of the Jeep. Complete with files and pencils, lists and notes, that I need to keep track of, for the six jobs I have been working on. |
Piles on the bed and beside the bed and around the bed with a walk through space in case I need to put my hand on something. |
Let us pray that the plastic keeps the cement dust at bay. |
Bright spot!! Dash and Albert rug swatches were delivered today. |
No comments:
Post a Comment